Investors & Capital Partners

Independently appraised.
Honestly staged. Built to compound.

A $382.8M third-party-appraised flagship position, a power program advancing through construction today, and a master plan engineered to multiply it — presented the way institutions expect: staged, sourced and structured.

$382.8M
Independently appraised AHI campus position
Third-party appraisal · 2026
10MW
First generation phase — in construction & commissioning
Project record · 2026
30MW
Initial phased pathway, gas contracted
Project record · 2026
300MW†
AHI master-plan design envelope on 119 acres
†Design objective — master plan
1GW-class†
Replication ambition across qualified platform sites
†Multi-site objective, partner-led
7
Markets mapped for disciplined replication
See Global Opportunities

The Pathline

From 10 MW in the ground to a 300 MW-class plan — and a 1 GW-class ambition.

Every step is labelled for what it is. The first phase is steel and permits. The master plan is engineered design. The gigawatt line is ambition — earned one qualified site at a time, exactly the way AHI was.

The capacity pathline, honestly staged
MW-class by stage — solid is in construction; dashed is design or ambition · capacity axis compressed (log scale)
10 30 300 1,000 10 MW In commissioning 30 MW Gas contracted · pathway 300 MW-class† AHI master plan — 119 acres 1 GW-class† — replication across sites
†Design objectives and multi-site ambition — not commitments; subject to commercial, regulatory and project milestones. Sources: project record; AHI master plan; management direction, 2026.
Built today119 titled acres · development permits issued · 10 MW generation in construction & commissioning · 138 kV interconnection program · AESO Stage 3
Committed next30 MW initial pathway with firm gas contracted with the utility
Engineered plan†≈300 MW-class campus design envelope on the existing 119 acres — the density the Qualify calculator runs on
Platform ambition†1 GW-class aggregate across replicated, partner-led sites that pass the same checklist AHI passed
Value anchor$382.8M independently appraised campus position — the platform's only published economics figure, by design

Havenz publishes one appraised number and stages everything else. Deeper economics live in project-specific data rooms, under NDA, with definitive documents governing.

Ways to Participate

Four doors into the platform.

Project Equity

Project-specific GP/LP structures with clean separation between projects — from the AHI flagship's phased delivery to community developments in planning.

Credit & Infrastructure Finance

Construction and term facilities against permitted, appraised, contracted positions — with AHI Management's reporting discipline behind every draw.

Land & JV Positions

Land-contribution joint ventures and direct land offerings — including packaged positions like the Calgary NE 7.9-acre offering below.

Strategic & Offtake-Linked Capital

Capacity, tenancy and offtake-linked participation for operators and strategics who want the infrastructure and the upside on one page.

Current Opportunities

Live positions across the portfolio.

AHI Red Deer under constructionAHI Red Deer — in construction

AHI — Flagship Participation

Capital, credit, tenancy and offtake participation across the flagship's phased delivery. $382.8M appraised position; 10 MW commissioning now.

Request the data room →
Calgary NE 7.9 acre solar storage campus conceptConcept vision — illustrative rendering

Calgary NE — 7.9 Acres, For Sale

Stoney Trail frontage at McKnight, inside city limits. $3.0M asking with DP-ready plans and 50% vendor financing. A land position with six ways to earn.

See the offering →
Moon Haven master plan concept on Gull LakeMaster plan concept — illustrative

Moon Haven — Private Overview

A 306.95-acre master-planned family resort community on Gull Lake's northwest shore. Full overview available by direct invitation, under NDA.

Request an invitation →

Governance & Reporting

Diligence-ready is the default state.


Every material claim on this website lives in a verification register with a source and a status. Every project carries a stage label. The one economics figure we publish is independently appraised. That is not marketing discipline — it is how the whole platform runs.

ValuationIndependent third-party appraisal of the flagship position (2026)
StructuresProject-specific corporations and GP/LP platforms; clean separation between projects
ReportingAHI Management project controls: schedules, budgets, decision records, one standard from build to operate
VerificationStage labels on every project; claims tracked in a live verification register
Data roomsStructured, NDA-gated project data rooms; definitive documents govern every participation

Next Step

Bring your mandate. We'll bring the register.

Important notice. This page is informational only. Nothing on this website constitutes an offer to sell or a solicitation of an offer to buy securities in any jurisdiction, investment advice, or a commitment to enter into any transaction. Design envelopes, pathways and ambitions marked † are objectives — not forecasts or commitments — and remain subject to commercial, regulatory and project milestones. Any participation would occur only under definitive project-specific documentation prepared with legal counsel, relying on available exemptions, following independent diligence.